September 16th 2008
 
Glenn worked at the red diamond engine
carburetor looks very neat only a bit dusty
Glenn installing the exhaust system and inlet
also the water cooler pipes installed.
finding back our parts, to get the important parts for driving ready for sandblasting
Another crate
progress on the hull. removed the bad hinges
put the hatch back on and lined up. So the the good hinges will be welded on the right place.
engine armour plates, test fit
As you can see it's a little bit bended, we have to get this out and reweld some hinges for the hatches.
first welding down, needs al little bit adjustment before finally welding it back up.
     
Back